Ready for the season
A beautiful antifouling and polishing job done by Stuart Southwick. The waterline has been lifted at the bow to try and reduce the fouling that is so typical of the Marchwood moorings.
After launch, Alan Ganter adjusted the throttle settings. The behaviour at low speeds just above tickover was tricky to handle
Leave A Comment